Views: 257 Author: Site Editor Publish Time: 2018-01-10 Origin: Site
Procedure
The filled bag shall be dropped on to the test panel from a height of 1 m.
The first drop shall make contact with the centre of the panel. A second drop shall be made on the centre of one edge of the panel so that the complete bag bottom meets the panel surface. The panel shall not collapse or crack.
Expression of results
The result shall be reported as PASS or FAIL depending on whether or not the panel collapses or
cracks. Any damage to the panel shall be reported.
Key
1 Sandbag
2 Panel
3 Pedestal
ATFLOR: Your first time choice, our life time service.
+86-13584352022
Copyright © 2023 XL Holding Group All Rights Reserved.